67th Place Public Enhancement to Willapa National Wildlife Refuge
Road improvements to a 0.15-mile stretch of 67th Place to improve public access and safety to the Willapa National Wildlife Refuge Headquarters and Natural Resource Center. Work included installation of a temporary diversion berm and turbidity curtains, roadway excavation, installation of cellular confinement systems, pipe culverts, turf establishment, and asphalt paving.
Plymouth Island Bank Stabilization
Wave erosion of an island in the Columbia River threatened archeological sites. Conway stabilized banks and completed the project on time.
South Coast Regional Seismic Resiliency Facility
Conway restored a substantial soldier pile and timber lagging retaining wall as well as associated sitework. Conway completed the job ahead of schedule.
Viento to Mitchell Point
This project involved three distinct elements: 1) conversion of two miles of the historic Columbia River highway into a paved bicycle and pedestrian path; 2) replacement of an existing campground; 3) extensive renovation of an existing maintenance building and yard. Some of the many, and widely varying, facets included: 1) clearing; 2) rock excavation; 3) […]
0.8 Miles West of Chapman Road Erosion Protection
In yet another encounter with the Cowlitz River, Conway installed turbidity curtains and constructed a revetment, including gores and plantings, along a bend in the river where erosion was threatening a highway. Conway completed this project well ahead of schedule and on budget, while complying with the many environmental regulations of the local, state, and […]