Big Creek Bridge

This was a structural rehabilitation and cathodic protection project. Conway completed it under live US 101 traffic and on time.

North Umpqua-Upper Rogue Bundle 560

Conway Construction Company rehabilitated four bridges along the scenic Rogue River and Umpqua highways. Work included historic concrete bridge rail and cantilever removal and replacement, steel bridge rail installation, bridge jacking and bearing replacement, seismic strengthening, timber cap removal and replacement, crack injection, Silica Fume Overlay, drainage improvements and roadway improvements. CCC completed this challenging […]

Goodpasture Road Bridge Rehabilitation

At 237-feet long, this covered bridge is the second longest in Oregon. Opened in 1938, time had taken a toll. Conway rehabilitated it by first installing internal, 160-foot-long steel trusses. We then transferred loads to the steel trusses and replaced structural elements of the wooden trusses.The work was performed during live traffic and completed on […]

Bristol Fill Deck Replacement

The work consisted of the complete replacement of the concrete deck and rails of an existing bridge. Conway completed it on time.

Morrison Bridge

Extensive bridge rehabilitation performed under live traffic.

US 101: Pistol River Bridge Repair

Ocean windsurfing is so good here that it has become the location for several national championships. However, fifty years of exposure to the salt laden air of the rugged Pacific Ocean had taken its toll on the Pistol River Bridge rendering it seriously deficient. Conway undertook this major bridge renovation and Cathodic Protection project in […]

Traffic Barrier Upgrades Project

Winter weather in the Columbia Gorge can be unpredictable, rapidly changing, and hazardous. It was during such conditions that Conway implemented many logistical techniques in widening numerous spots along an eighty mile stretch of Interstate 84. We simultaneously replaced cast-in-place concrete guardrails on multiple bridges. Work was performed under live traffic and completed on time.