The North Going Street Bridge has been identified by the City of Portland as a vital economic link for the area. Through ODOT, the City contracted with Conway Construction Company to perform seismic upgrades and repairs to the bridge to ensure access to the Swan Island industrial area after a seismic event. CCC performed traffic control, removed the impact panels for drilled shaft placement, replaced the panels, installed resin bonded dowels for a new rebar deck mat, overlayed the entire bridge with microsilica concrete, installed two tube steel rail and pedestrian rail, removed the existing sidewalk from atop precast box girders and replaced the sidewalk with a 8′ multi use lane.