Conway Construction Company replaced a segmental Bailey Bridge over a canal in Central Washington with a 150′ bulb tee girder for Grant County Public Works. The girders weighed close to 200,000 lbs each and required a detailed a technical picking plan which was successfully executed by Conway performed by CCC and its sub-contractor Axis Crane. CCC completed the contract within a 50 calender time frame beginning after the canal was drained in the fall.