Our Projects

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut
IMG_4627
IMG_3623

Mitchell Street and Black Rock Road

Location

Falls City, Oregon

Project Category

River Diversion, Rockery Wall, Bridges, Drainage, and Roadway Reconstruction

Description

This is reconstruction of a road that serves residential, recreational, and natural resource sites. To keep traffic flowing through the project we will be installing a temporary bypass bridge and traffic signals. Then we construct a new bridge and multiple river diversions to accommodate the placement of rip rap and rockery walls. Deep culverts and precast concrete retaining walls. Excavation, base rock, and paving of the road.

image1

US 30 at Bridge Avenue East Ramp

Location

Portland, Oregon

Project Category

Rockfall Mitigation and Road Repairs

Description

This project requires extensive traffic control measures. We will remove numerous hazard trees and excavate and dispose of contaminated soils. Rockfall work on slopes is another key element.

IMG_3799

Barnes-Agency Phase 1

Location

Chiloquin, Oregon

Project Category

Wetland Development, Earthwork, and Grading

Description

This project furthered habitat creation through the excavation and embankment of wetland dikes and the construction of access roads. Conway worked closely with private, federal, and Native American entities to overcome soft soil conditions and winter weather to complete this project on time.

IMG_3841

Overhead Johnson Creek Seismic Sewer Crossing

Location

Gresham, Oregon

Project Category

Sewers: Diversion, Underground Pipe, and Overhead Flyover

Description

An existing sewer line flyover of Johnson Creek was seismically unstable and needed replacement. Construction challenges included limited access, property owner operations, environmentally sensitive areas, tree protection, varying underground conditions, winter weather, and high stream flows. Conway collaborated closely with engineers and the owner to improve the constructability of the drawings and develop a plan to navigate all obstacles. The result was a project completed on time and to the owner’s satisfaction.

Viento to Mitchell Point

Location

Hood River, OR

Project Category

Excavation, Grading, and Structures

Description

This project involved three distinct elements: 1) conversion of two miles of the historic Columbia River highway into a paved bicycle and pedestrian path; 2) replacement of an existing campground; 3) extensive renovation of an existing maintenance building and yard. Some of the many, and widely varying, facets included: 1) clearing; 2) rock excavation; 3) earthwork; 4) grading and paving; 5) erosion and sediment control; 6) traffic control on Interstate 84; 7) concrete median barrier; 8) underground utilities; 9) building construction; 10) rockery and stone masonry walls; 11) MSE walls; 12) gabion walls; 13) lined and painted cast-in-place concrete walls; 14) a septic and fuel systems; 15) wood, concrete, and metal railings; 16) rockfall; 17) and much more. The contract allowed 3 years for completion, but Conway finished in a little over half that time.

123_1
20230815_142810_photo_20230815_142800

South Coast Regional Seismic Resiliency Facility

Location

Coos Bay, OR

Project Category

Excavation, Grading, and Structures

Description

Conway restored a substantial soldier pile and timber lagging retaining wall as well as associated sitework. Conway completed the job ahead of schedule.

1
2
2022.03.10
2022.04.12
Image

US20 Upper Sunken Grade Slide Repair

Location

Cascadia, OR

Project Category

Road Construction and Structures

Description

To arrest a slow-moving landslide that jeopardized Highway US20, Conway constructed a four hundred foot long by 40-foot-tall soldier pile and timber lagging retaining wall with a cast-in-place concrete facing. Conway performed the work under live traffic and during a winter of record rain and snowfall yet finished on time.

IMG_9930

Rogue River Repairs

Location

Gold Beach, OR

Project Category

Road Construction and Structures

Description

Conway performed the work under live traffic during winter conditions and completed it on time.

IMG_8851
IMG_8852
IMG_9032

Heart O’ the Hills Entrance Station

Location

Port Angeles, WA

Project Category

Underground Utilities & Roadway

Description

Each year over three million visitors pass through the beautiful Olympic National Park. Conway reconstructed and updated the entrance through which they drive. Visitors were able to safely pass through the construction zone while Conway completed the job on time.

print this one
September 2021 (4)
SnapShot(14)
SnapShot(15)
SnapShot(18)
SnapShot(19)
SnapShot(23)
2023.01.16 photo of award (1) (2)

Mitigation Site for OR140

Location

Klamath Falls, OR

Project Category

Wetland Development, Earthwork, and Grading

Description

An endangered fish is sacred to native Americans near Klamath Lake. Conway created habitat and breeding areas by excavating channels and ponds within a wetland. This required sediment containment and the construction of temporary timber-mat access roads out into the lake. Conway completed the project ahead of schedule and earned an environmental excellence award.

  • Links
Click here
Rectangle 642

Yaquina Outstanding Natural Area Observation Deck Replacement

Location

Newport, Oregon

Project Category

Deck Replacement

Description

Each year upwards of 500,000 people visit the Yaquina Outstanding Natural Area. The lighthouse and surrounding observation deck give access to panoramic views of the Pacific Ocean and the inland coast range. Conway replaced the deteriorating wood deck with a custom structure of cast-in-place concrete, basalt masonry, and metal and wood hand-railings. Though rainy conditions were a challenge, Conway completed the project on time.

PXL_20210429_141906860
Screen-Shot-2021-05-06-at-11.25.21-AM
PXL_20210429_142118810
PXL_20210429_142006123

Oneonta Tunnel Rehabilitation

Location

Columbia Gorge, Oregon

Project Category

Tunnel

Description

The Oneonta Tunnel originally opened in 1914 as part of the Historic Columbia River Highway. The 2017 Eagle Creek Fire badly damaged its wood lining. Conway removed the damaged lining and replaced it with rough-sawn Western Red Cedar. We utilized prefabrication techniques to improve quality and expedite completion ahead of schedule.

image2

Pedestrian Bridge

Location

Portland, OR

Project Category

Pedestrian Bridge

Description

Westmoreland Park needed a new pedestrian crossing that would be safe and accessible for park visitors while improving habitat contributing to stream restoration efforts. Conway delivered the bridge on time.

Baskett Slough Headquarters Access Design and Ankeny Hill Nature Center Access

Location

Marion and Polk County Oregon

Project Category

Highway, Sitework and Park

Description

Added a Turn Lane to OR-22 including sub-excavation, excavation, embankment, culvert extension, aggregate base and paving. Ankeny Hill Nature Center: Built Access Road, Precast Box Culvert, parking lot, drainage, Visitor Contact Building and walking trails.

  • Links
Letter from Oregon Military Department Noting Successful Completion

High Priority Bridge Repair

Location

Swan Valley, Idaho

Project Category

Bridge Rehabilitation

Description

This steel-truss bridge is a gateway to Jackson Hole, Wyoming, and Grand Teton National Park, but the bridge deck had deteriorated. At 5,000 feet elevation in the Rocky Mountains the weather window is short and unforgiving. Conway replaced some of the deck and overlayed all of it. We also replaced joints and improved drainage. Conway completed this job under live traffic and on time, just prior to winter snowfall.

IMG_8830-scaled
IMG_8972-scaled
yakim_3-scaled
yakim_4-scaled

Yakima County Overlays

Location

Yakima County Wa

Project Category

Overlays

Description

Conway Construction completed the concrete bridge overlays of two bridges in Yakima County within the 50 working day construction schedule by performing work 6 days a week, often employing two shifts a day.

IMG_4753

Medford District Road Repairs

Location

Grants Pass, OR

Project Category

Road Reconstruction and Slope stabilization

Description

Mountain roads in steep, remote terrain make for challenging working conditions. Conway accepted this challenge and timely completed the project.

Bonneville Cascade Island Subsidence Interim Repairs

Location

North Bonneville, WA

Project Category

Civil

Description

Conway constructed a crane pad with settling plates to aid construction of other structural work. Conway completed this project on time.

image5
image4

Bridge Approach Deck Rehabilitation Project

Location

Cascade Locks, OR

Project Category

Bridge Approach Repairs

Description

With annual traffic crossings averaging about 1.6 million vehicles, The Bridge of the Gods plays an important role in the regional economy on both sides of the Columbia River. Working under live traffic, Conway overlayed the concrete approach deck on the north side. Conway completed this job under live traffic and on time.

mxop-c5l-min
Mdj6VlnG-min
_6Ao3P-d-min
CqKLMMXE-min

Snoqualmie Repairs

Location

North Bend, WA

Project Category

Road Repairs

Description

This was another mountain road project in steep, remote terrain that made for challenging working conditions. Again, Conway accepted the challenge and timely completed the project.

ywFh0rLh-min
4BKvZMrW-min
47Bckj6M-min

Highland Road Culvert Replacement

Location

Shelton, WA

Project Category

Culvert Replacement

Description

Deterioration of a smaller, existing metal culvert threatened an existing roadway embankment. Conway replaced this culvert with a larger, multi-plate, arch culvert. Conway completed this job on time.

dvEkWbp8
p0Pl2QmF
i84_img1
i84_img2

Traffic Barrier Upgrades Project

Location

Rufus, OR

Project Category

Bridge Rehabilitation

Description

Winter weather in the Columbia Gorge can be unpredictable, rapidly changing, and hazardous. It was during such conditions that Conway implemented many logistical techniques in widening numerous spots along an eighty mile stretch of Interstate 84. We simultaneously replaced cast-in-place concrete guardrails on multiple bridges. Work was performed under live traffic and completed on time.

Rehabilitate Staircase Road

Location

Olympic Nat. Forest, Hoodsport, WA

Project Category

Road Repairs

Description

Staircase Road is in the southeastern corner of the Olympic National Park. It is the only access to a campground bearing the same name. While maintaining access for park personnel, Conway constructed underground utilities and renovated the road. Conway completed this job on time.

VPajKS_A (1)

Bridge & Culvert Rail Upgrades

Location

Medford, OR

Project Category

Railings and Culverts

Description

Conway renovated railings and culverts at two existing bridges. Conway completed this job under live traffic and on time.

Plymouth Island Bank Stabilization

Location

Plymouth, WA

Project Category

Civil, Excavation and Bank Armoring

Description

Wave erosion of an island in the Columbia River threatened archeological sites. Conway stabilized banks and completed the project on time.

Rm6QP9Tw (1)

Rehabilitate Lift Stations

Location

Ft. Vancouver, Vancouver, WA

Project Category

Sewer

Description

Conway completed this job on time.

5C5Wdx4Q (1)

Chehalis River Adna Bridge Replace Expansion Joints

Location

Adna, WA

Project Category

Bridge Rehabilitation

Description

This bridge renovation required night work and Conway completed it on time.

cowlitz-slide10
cowlitz-slide1
cowlitz-slide6-scaled
cowlitz-slide8-scaled
cowlitz-slide4-scaled
cowlitz-slide2-scaled
cowlitz-slide3-scaled
cowlitz-slide9-scaled
cowlitz-slide5-scaled

Cowlitz Valley Road Repairs

Location

Randle, Wa

Project Category

River Diversion, Drainage, and Roadway Reconstruction

Description

Conway Construction diverted the Cispus River, Repaired the damaged roadway washed away by the river, Installed two precast concrete box culverts, two large culverts and performed bridge repair. In total Conway completed 8 sites.

W_JPiOzL (1)

SE Tacoma/Johnson Creek Max Station Stairs to Springwater Corridor Trail

Location

Portland, OR

Project Category

Concrete Paving

Description

Conway timely completed this concrete stairway.

Center Street Bus Yard

Location

Portland, OR

Project Category

Concrete Paving

Description

Conway timely completed the replacement of concrete pavement.

Ms3_omNl (1)
joUm0jqv (1)

Westside Bike & Ride

Location

Beaverton & Portland, OR

Project Category

Bike Shelters

Description

Conway timely constructed two bike shelters.

q4uCi97e (1)
lydepX84 (1)
rVUtPVBA (1)

Cowlitz Valley Road Repairs, Phase 1

Location

Randle, WA

Project Category

Culverts and Roadway

Description

Conway reestablished remote forest roads along the Cowlitz River by constructing MSE walls, culverts, revetments, river diversions, and other repairs. Conway completed this job under live traffic and on time.

bmMbT8t6 (1)

Gateway Bike & Ride

Location

Portland, OR

Project Category

Bike Shelters

Description

Conway timely constructed a bike shelter.

IMG_0377-scaled
IMG_0468-scaled
IMG_0513-scaled
IMG_0466-scaled
IMG_0748-scaled
IMG_0756-scaled
IMG_0485-scaled
IMG_0486-scaled
IMG_0462-scaled

Repair Mather Memorial Slide

Location

Packwood, WA

Project Category

Retaining Walls, Culverts and Roadway

Description

SR 410 is one of only East/West Crossings in Washington. Due to snow, it is open 6-7 months a year. To minimize the impact to the community and traveling public, the Federal Highway administration required that the project be accelerated. Conway Construction worked 6 days a week to remove asphalt as thick is 4′, perform roadway excavation, build 2,800 square feet of mechanically stabilized earth (MSE) walls, replace culverts, place base rock and pave. Conway Construction met the aggressive project schedule and earned the commendation of both the National Parks Service and the Highway Administration

K7Yzgps8 (1)

Foster Scour Repair

Location

Oregon City, OR

Project Category

Scour Repair

Description

Conway built infrastructure to protect the abutments of an existing bridge. Conway completed this job on time.

Modular Restroom Building

Location

Vancouver, WA

Project Category

Restroom

Description

Conway timely completed this project.

slider_astor_1
ed78d69_ (1)
slider_astor_2
slider_astor_4
slider_astor_5
slider_astor_6
slider_astor_3
slider_astor_7
slider_astor_9
slider_astor_8

Port of Astoria Waterfront District Stormwater System Improvements

Location

Astoria, OR

Project Category

Civil

Description

Timber companies ship logs through the Port of Astoria to points around the globe, but this presents environmental challenges. Conway mitigated wood waste contaminated storm drain run off by constructing a system comprised of pump stations, transmission lines, and treatment ponds. The work required caissons, dewatering, and major earthwork. Conway completed it on time.

Bus Stop Safety

Location

Streamlining and Rehab Ph 5, Vancouver, WA

Project Category

Bus Stop

Description

Conway timely constructed this bus stop.

ast-south-slide2
ast-south-slide3
ast-south-slide1
ast-south-slide4
ast-south-slide6
ast-south-slide5

A Street Improvements

Location

Parkland, WA

Project Category

Civil

Description

Conway Construction Company constructed intersection improvements including 2,000 ft of storm sewer, structural shoring, a 20’x 80’ precast storm sewer detention vault, signals, road base, curb, gutter, sidewalk, and paving.

nitch_slide3
nitch_slide5
nitch_slide1
nitch_slide2
nitch_slide4
nitch_slide6
ig4CHRLE-min
-rVz5R3k-min

Dismal Nitch Rest Area

Location

Megler, WA

Project Category

Civil

Description

CCC rehabilitated the Dismal Nitch Rest area with new curbs, sidewalk, paving, interpretive signs, pedestrian railing, decorative curved concrete walls with painted faux stone, topsoil and plantings. CCC accomplished the work under a tight schedule during one of the wettest falls in memory. CCC received commendations from the Federal Highway Administration for their work on the project.

  • Links
Final Acceptance/Commendation Letter from FHWA
FHWA
Picture (1)
rehab_img3
rehab_img4
rehab_img2
cd6ld6At-min
C7nYzZjX-min
LzIIyXag-min

US 101: Pistol River Bridge Repair

Location

Gold Beach, OR

Project Category

Cathodic Protection, Bridge Rehabilitation

Description

Ocean windsurfing is so good here that it has become the location for several national championships. However, fifty years of exposure to the salt laden air of the rugged Pacific Ocean had taken its toll on the Pistol River Bridge rendering it seriously deficient. Conway undertook this major bridge renovation and Cathodic Protection project in order the extend the service life of this vital link to the Southern Oregon Coast. Cathodic Repairs included removal and replacement of 1,100 square yards of damaged concrete, repair of over 700 damaged reinforcing bars, elimination of discontinuous reinforcing bars, removal of near surface metals, installation of zinc annode coating, and DC power distribution and remote monitor system wiring. In addition, Conway replaced the bridge bearings, replaced 1,100 feet of concrete bridge rail, installed seismic restraints and installed a silica fume overlay. Further, Conway redesigned the Agency’s traffic control plan, setting a model for future projects and saving Oregon tax payers over $300,000. The project was significant as it was one of the first non-historic bridges in Oregon to receive cathodic protection and repairs in lieu of replacement.

chapman-rd-slide9
chapman-rd-slide1
chapman-rd-slide2
chapman-rd-slide3
chapman-rd-slide5
chapman-rd-slide6
chapman-rd-slide4
chapman-rd-slide7
chapman-rd-slide8
chapman-rd-slide10-1

0.8 Miles West of Chapman Road Erosion Protection

Location

Randle, Wa

Project Category

Civil, Excavation, Bank Armouring

Description

In yet another encounter with the Cowlitz River, Conway installed turbidity curtains and constructed a revetment, including gores and plantings, along a bend in the river where erosion was threatening a highway. Conway completed this project well ahead of schedule and on budget, while complying with the many environmental regulations of the local, state, and federal permits.

South River Road Slope Mitigation

Location

Salem, OR

Project Category

Slope Stabilization

Description

This project involved rockfall and slope stabilization between residences above a steep slope and a busy road below. Conway completed the work on time.

usace-slide1
usace-slide2
usace-slide3

USACE Pierce County Emergency Revetment Repair

Location

Orting, Wa

Project Category

River Revetment

Description

The USACE called on a Thursday to announce its award of this contract to Conway Construction Company. Conway Construction Company was on the ground working by Saturday of the same week. CCC provided four 86,000lb-95,000lb excavators, five dump trucks, a water truck and grader to perform the work.

gorxDULm-min
g5cGTl95-min
VLDWtAjm-min
7Rmhb9tK-min
fkokgcNQ-min

Orchards Area TIF Project

Location

Vancouver, WA

Project Category

Sewer and Roadway

Description

A Sewer, water, storm drain, and roadway construction project which Conway completed on time.

oaHKoTA6-min
mrn1ULHR-min
26ak9fS4-min
enZeyjT6-min
M66lZ-B4-min
6X2gjgau-min
jQ579wKJ-min
-XPPf1fM-min

2014 BRRP 15th Ave West Interchange Project

Location

Seattle, Wa

Project Category

Bridge Rehabilitation

Description

15th Ave is a vital link to the Ballard District. Minimization of traffic impacts was a top priority for the City. CCC addressed this priority limiting closures and accelerating the work CCC safely removed the existing girder and set the new girder in one weekend with 2 night closures. CCC accelerated the work, finishing the project 20 working days faster.

Clink the link below to watch a 2 minute Video of the project produced by the Seattle Department of Transportation:

  • Links
Click here
rilea-slide4
rilea-slide1
rilea-slide3
rilea-slide2
rilea-slide6
rilea-slide5

Camp Rilea Armed Forces Training Center Structural Collapse Venue

Location

Warrenton, OR

Project Category

Civil, Unique

Description

This project included the assembly of a unique structure which represents earthquake damaged buildings as a venue for emergency training. Conway performed extensive analysis and CAD drawings in order to assure the structure fit as designed. Conway beat the schedule for this demanding process and earned the accolades of the Oregon Military for a job well done.

C-Tran Super Stops Andresen Road Southbound Site

Location

Vancouver, WA

Project Category

Bus Stops

Description

Conway completed these bus stops on time.

IcSBHmqu-min
MrBVb1T5-min
HcvUkEa4-min

Bristol Fill Deck Replacement

Location

Bristol, Washington

Project Category

Bridge Rehabilitation

Description

The work consisted of the complete replacement of the concrete deck and rails of an existing bridge. Conway completed it on time.

cougar-slide2
cougar-slide1
cougar-slide4
cougar-slide6
cougar-slide3
cougar-slide5
cougar-slide7

Cougar Creek Bridge Replacement

Location

Washougal, WA

Project Category

Bridge Replacement, Road Construction

Description

The Cougar Creek Bridge was a 26′ timber span sitting on mortared rock abutments built in 1926 that had outrun its service life. Conway Construction replaced the existing bridge with a new 60′ concrete span that allowed for a wider roadway. In addition, the creek channel was returned to a natural state not possible with the narrow existing structure. To do this, CCC had to divert the Cougar Creek through a bypass during an in-water work period. CCC also replaced the roadway approaches and installed drainage which included over 300 yards of rock excavation.

pasture-slide1
pasture-slide4
pasture-slide2
pasture-slide5
pasture-slide3
pasture-slide6

Goodpasture Road Bridge Rehabilitation

Location

Vida, Oregon

Project Category

Bridge Rehabilitation

Description

At 237-feet long, this covered bridge is the second longest in Oregon. Opened in 1938, time had taken a toll. Conway rehabilitated it by first installing internal, 160-foot-long steel trusses. We then transferred loads to the steel trusses and replaced structural elements of the wooden trusses.The work was performed during live traffic and completed on time.

  • Links
Click here

Daybreak Bridge Seismic Improvements

Location

Clark County, Washington

Project Category

Bridge Rehabilitation

Description

This was a bridge rehabilitation completed under live traffic and on time.

Barnard Bridge Repair Project

Location

Oakridge, OR

Project Category

Bridge Rehabilitation

Description

This was a bridge rehabilitation that Conway completed under live traffic and on time.

43Cuq7Pc-min
yLw-zuHK-min
wrzUN5D1-min

Morrison Bridge

Location

Multnomah County, OR

Project Category

Bridge Rehabilitation

Description

Extensive bridge rehabilitation performed under live traffic.

k38-dosI-min

Big Creek Bridge

Location

Waldport, OR

Project Category

Bridge Rehabilitation

Description

This was a structural rehabilitation and cathodic protection project. Conway completed it under live US 101 traffic and on time.

rogue-slide3
rogue-slide2
rogue-slide5
rogue-slide6
rogue-slide4
rogue-slide8
rogue-slide7
rogue-slide9

North Umpqua-Upper Rogue Bundle 560

Location

Douglas & Jackson Counties, Oregon

Project Category

Cathodic Protection and Bridge Rehabilitation

Description

Conway Construction Company rehabilitated four bridges along the scenic Rogue River and Umpqua highways. Work included historic concrete bridge rail and cantilever removal and replacement, steel bridge rail installation, bridge jacking and bearing replacement, seismic strengthening, timber cap removal and replacement, crack injection, Silica Fume Overlay, drainage improvements and roadway improvements. CCC completed this challenging project on time by meeting challenging on time and budget problems with creative solutions. For example, CCC found a way to place the second stage of the Silica Fume overlay in November at 4,000 feet elevation with nighttime freezing temperatures while meeting ODOT’s stringent cold weather curing requirements.

uskbridge-slide1
uskbridge-slide6
uskbridge-slide5
uskbridge-slide4
uskbridge-slide3
uskbridge-slide2
uskbridge-slide7

Usk Bridge: Major Maintenance

Location

Usk, WA

Project Category

Bridge Rehabilitation, Bridge Overlay

Description

At 2,281 feet long the Usk Bridge spans the Pend Orielle River one hour North of Spokane, WA. The length of the bridge, coupled with the requirement to maintain one lane of traffic during construction, posed significant logistical challenges. Conway completed the hydrodemolition of the bridge deck, silica fume overlay, bridge joint replacement, damaged concrete repairs, wood pile splice and wood pile FRP wraps on time and budget. To satisfy traffic restraints, Conway performed the hydrodemolition next to live traffic while protecting the traveling public from flying debris. Over the course of the project, Conway processed over one million gallons of contaminated water resulting from the hydrodemolition of the bridge deck.

bridge-deck-repairs-300x203

FY09 D6 Bridge Deck Repairs

Location

Rigby, ID

Project Category

Bridge Rehabilitation, Bridge Overlay

Description

With five bridge deck overlays in two stages each and 70 calendars days to complete the project, its no wonder we didn’t have time to take pictures. CCC self performed the hydro-demolition, silica fume overlay and incidental bridge repair on this project. Conway completed this project just before the onset of a cold Idaho winter.

ngoing-slide1
ngoing-slide6
ngoing-slide2
OLYMPUS DIGITAL CAMERA
ngoing-slide5
ngoing-slide7
OLYMPUS DIGITAL CAMERA

N. Going St Bridge Rehabilitation

Location

Portland, OR

Project Category

Bridge Rehabilitation, Seimic Upgrades

Description

The North Going Street Bridge has been identified by the City of Portland as a vital economic link for the area. Through ODOT, the City contracted with Conway Construction Company to perform seismic upgrades and repairs to the bridge to ensure access to the Swan Island industrial area after a seismic event. CCC performed traffic control, removed the impact panels for drilled shaft placement, replaced the panels, installed resin bonded dowels for a new rebar deck mat, overlayed the entire bridge with microsilica concrete, installed two tube steel rail and pedestrian rail, removed the existing sidewalk from atop precast box girders and replaced the sidewalk with a 8′ multi use lane.

homestead-slide3
homestead-slide2
homestead-slide1
homestead-slide6
homestead-slide5
homestead-slide8
homestead-slide9
homestead-slide12
homestead-slide11
homestead-slide7
homestead-slide10

I-5: Homestead to Gold Hill Bundle 313

Location

Gold Hill, OR

Project Category

Bridge Rehabilitation

Description

Conway performed repairs to five bridges, installed a 20′ tall soil nail/cast in place concrete retaining wall with custom imprints, installed cast-in-place concrete barrier, and performed roadwork. Bridge improvements included installing reinforced shear walls against the existing box girder stems from inside the box girder, seismic blocks, and FRP. Conway self-performed installation and post tensioning of a reinforced concrete girder bridge for this project. The project was completed in less than 6 months – 4 months ahead of schedule

Jetty Creek Culvert Replacement

Location

Rockaway Beach, Oregon

Project Category

Culverts

Description

An existing metal culvert was deteriorating and thereby threatening US 101. Conway removed the existing culvert and constructed a new concrete bridge. Conway completed this project under live traffic and on time.

grantcounty-slide2
grantcounty-slide5
grantcounty-slide6
grantcounty-slide3
grantcounty-slide4
grantcounty-slide1

Bridge #118, F-NE Road CRP 06-06

Location

Soap Lake, WA

Project Category

Bridge Replacement

Description

Conway Construction Company replaced a segmental Bailey Bridge over a canal in Central Washington with a 150′ bulb tee girder for Grant County Public Works. The girders weighed close to 200,000 lbs each and required a detailed a technical picking plan which was successfully executed by Conway performed by CCC and its sub-contractor Axis Crane. CCC completed the contract within a 50 calender time frame beginning after the canal was drained in the fall.

  • Links
Grant County Public Works Letter of Commendation
David Evans and Associates EOR Letter of Commendation
J_b1pGk2 (1)

Battleground Skate Park and Road Improvements

Location

Battle Ground, WA

Project Category

Civil

Description

Conway constructed this 27,000 square-foot, cast in place concrete skate park and associated street improvements. The park has since earned the rank of second-best skate park in the state by the Seattle Times and one of the nation’s top ten skate parks by Best of American Towns. Conway completed the project on time.

  • Links
Click here

Wilkes Sound Wall

Location

Wilkes Sound Wall

Project Category

Civil

Description

Conway completed this job under live traffic and on time.

Deck Rehabilitation of Two Bridges

Location

Wapato, WA

Project Category

Bridge Rehabilitation

Description

Enduring hot, dry weather and heavy traffic, Conway overlayed the concrete decks of two bridges. Conway completed this job under live traffic and on time.

  • CONWAY CONSTRUCTION COMPANY
    6620 NW Whitney Rd, Suite 100
    Vancouver, Washington, 98665 USA

Portfolio

  • PORTFOLIO
  • BIDDING
  • EQUIPMENT
  • CONTACT US
  • CAREERS

Subscribe

Get Connected with us on Socials

  • Terms of use
  • Privacy Policy
  • Sitemap
  • Conway Construction Company © 2024. All rights reserved.